TRANSPORTATION AND HANDLING OF WIND TURBINES FOR THE CHO LONG WIND POWER PLANT | 155 MW

TRANSPORTATION AND HANDLING OF WIND TURBINES FOR THE CHO LONG WIND POWER PLANT | 155 MW

By 31 tháng 12, 2021 - 09:18 (GMT +07)
  • Project Name: Cho Long Wind Power Plant
  • Project Owner: Cho Long Wind Power Joint Stock Company  
  • Capacity: 155 MW
  • Location: Gia Lai
  • Duration: 3 months
  • Specifications:

- Turbine type:  Envision - En3.X/156 WTG 

- Longest item type: Blade: 76 m  

- Heaviest type of cargo: Drivetrain: 103 tons  

- The widest and tallest type of cargo: Tower 1: Ø5,6 m  

  •  Scope of work:

- Receive goods from Quy Nhon Port and transport them to a temporary storage yard;

- Transporting equipment from the temporary storage area to the project site;

- Carry out the lifting and lowering of equipment from the transport vehicle to the turbine pedestal location.