TRANSPORTATION AND HANDLING OF WIND TURBINES FOR THE SAVAN 1 WIND POWER PLANT, PHASE 1 | 300 MW

TRANSPORTATION AND HANDLING OF WIND TURBINES FOR THE SAVAN 1 WIND POWER PLANT, PHASE 1 | 300 MW

By 20 tháng 11, 2025 - 17:00 (GMT +07)

SAVAN 1 WIND POWER PLANT PROJECT - PHASE 1 | 300 MW 

  • Project Name: Savan 1 Wind Power Plant
  • Project Owner: Savan 1 Wind Power Company Limited   
  • Capacity: 300 MW
  • Location: Savannakhet, Lao PDR
  • Duration: 8 months 
  • Specifications:

- Turbine type: Goldwind GWH171-6.25 MW 

- Blade: 85 m   

- Heaviest type of cargo: Tower S1: 115 tấn   

- The widest and tallest type of cargo: Tower S1: Ø5,36 m

  • Scope of work:

- Receive goods from Hon La Port and transport them to the temporary site storage area;

- Lifting and lowering equipment from vehicles to a temporary storage area at the construction site;

- Lift and transport all equipment from the temporary site storage area to the base of the pier/column.

Savan

z7771697950898_ccfe069ddd91c533e19fe84305567ebb

VP
Savan (7)
Savan (5)
vlcsnap-2026-03-18-11h36m37s984
Savan (3)
Savan (2)
Savan-1

Comment
Popup image default

Notice