Transporting a 220kV-250MVA transformer from Dong Anh to Thai Binh 2 Thermal Power Plant.Transporting transformer casings to the Dong Anh Electrical Equipment Factory.Transporting transformers by road and water.Transporting a transformer (109 tons) using a COMETTO semi-trailer.Transporting the 63MVA MBA transformer from the ABB plant to Hai Phong Port.Transporting the 220kV-250MVA transformer body to the Xuan Mai 220kV substation.Transporting and installing Super T beams.Transporting and installing bridge girders for the Tam Diep railway overpass in Ninh Binh.Transportation and installation of bridge girders for Hop Ly Bridge - Ha Nam.Transporting tunnel boring machinesTransporting crane girders to the Huội Quảng hydroelectric power plant construction site.Transporting a 600T crawler crane body to Thai Binh 2 Thermal Power Plant, Thai Thuy, Thai Binh.Transporting a crawler crane for the Hong Sa Thermal Power Plant, Lao PDR.Transporting 24 Caterpillar mining trucks and construction machinery from Lai Chau Hydropower Plant to Xekaman 1 Hydropower Plant in the Lao People's Democratic Republic.Transporting chimneys for the Dung Quat oil refinery.Transporting steel structures from Bac Ninh to Hai Phong.Transporting electromechanical equipment for the Ngoi Hut 2 and 2A hydropower projects.Manual lifting and lowering of MBA (Medium Voltage Transformer)